Services
We Are Expertise At
Our Services.
The quality of our services is the backbone of our long term relationships with all of our clients

Since its establishment in 2010 AL-Namaa Foundation has been very interested in the overhead power lines, because of their economic cost and their long dedivciable life. Moreover, these lines are easy to maintain and can afford extra loads during the project life cycle very well.
Al-Namaa foundation has been able to execute all of its overhead power line projects in time, within budget and in compliance with all technical specifications. Al-Namaa Foundation is very proud of its professional team and its know-how, that enable it to carry out any types of overhead power lines (up to 500 K.V).
Refence projects executed by Al-Namaa Foundation in the last 10 years:
1- The project of modifying part of the electrical line Al-Muneef / Al-Raswa, voltage of 220 kV, due to its opposition to the construction of the bridge in the roundabout of the city of Qantara West..
– The point of reference / Egyptian Electricity Transmission Company – Canal Electricity Zone
2–The project of modifying the route of the existing Abu Tartour / Balat 220 kV line to enter the Balat transformer station
The authority / the Egyptian Electricity Transmission Company – Central Egypt.
3- Project of modifying the lines inconsistent with the electric train route (LRT) New Cairo / Gulf of Suez and Suez 2 / Badr effort 220/66 kV
The authority / Giza Integrated Solutions Company
4- The project of modifying part of the route of the Zagazig / Harya electric line, with a voltage of 66 kV, to the ground cables in the opposing part of the implementation of the Shroueda bridge
The authority / Egyptian Electricity Transmission Company – West Canal Projects Sector
5- Al-Rubiki :















Modifying the overhead lines with a voltage of 220 K.V that conflict with the Rubiki Railway construction project / 10th of Ramadan / Belbeis, which are: ( Badr 500/1 LRT with a voltage of 220 K.V ) & (Badr 2 / Zizinia voltage 220 K.V).
Owner: Egyptian Electricity Transmission Company – West Canal Zone
contractor : Alliance of Giza Power Company for Industry and Al-Namaa General Contracting Establishment
6- Al-warak :













Connecting the Rawd al-Farag transformer station, voltage 220/66 K.F with the electrical network voltage 66 K.F, by dismantling the (Shubra / Warraq) antenna cable circuit and extending a cable from the Warraq side to become (Rawd al-Farag / Shubra) in the Cairo Electricity District.
Owner: Egyptian Electricity Transmission Company – Cairo Electricity District
contractor : Alliance of Giza Power Company for Industry and Al-Namaa General Contracting Establishment
7- Opening the air line north of Qena Al-Salihiya :














Connecting the East Qena transformer station to the national grid, voltage 66 K.V , By opening the dual-circuit air line (North Qena Al-Salihiya / North Qena Al-Muhalla) using ACSR sector 380*2/50 mm2 dual connectors with a length of (14*2 km).
Owner: Egyptian Electricity Transmission Company – Upper Egypt Region
contractor : Alliance of Giza Power Company for Industry and Al-Namaa General Contracting Establishment
8- Minya transformer station :






Connecting the Minya transformer station (Maqoussa) to the national grid, voltage 66 K.V , In the Middle Egypt Electricity Zone.
Owner: Egyptian Electricity Transmission Company – Central Egypt Region
contractor : Alliance of Riyad Company and Al-Namaa General Contracting Establishment